Control Hub

Step 1: Add the Support Plate

Parts Needed:

  • REV-41-1166 – Battery Holder Plate (1)

  • REV-41-1361 – Nut, Locking, M3 (2)

../../../../../_images/BasicB033.png

Figure 37- Unassembled view

../../../../../_images/BasicB034.png

Figure 38- Assembled view

Step 2: Add the Rev Robotics Control Hub

Parts Needed:

  • REV-31-1153 – Control Hub (1)

  • REV-41-1360 – Screw, Hex Cap, M3, 16mm (2) (two other screws are already in the extrusion from an earlier step)

  • REV-41-1361 – Nut, Locking, M3 (4)

../../../../../_images/BasicB035.png

Figure 39- Unassembled view

../../../../../_images/BasicB036.png

Figure 40- Assembled view

Hint

  • Reposition the front support beam, if necessary, to accomplish the proper spacing – the two floating screws on the front beam need to be at the corners of the control hub.

Step 3: Add the Left Drive Motor Power Cable

Parts Needed:

Motor Power Cable (1 – comes with the core hex motor – REV-41-1300)

../../../../../_images/BasicB037.png

Figure 41- Unconnected view

../../../../../_images/BasicB038.png

Figure 42- Connected view

Step 4: Add the Right Drive Motor Power Cable

Parts Needed:

Motor Power Cable (1 – comes with the core hex motor – REV-41-1300)

../../../../../_images/BasicB039.png

Figure 43-Unconnected view

../../../../../_images/BasicB040.png